Application form for seeking approval to commence power supply in overhead line exceeding 650 volts

Service Details are:

 
Service is defined by the - LINE DEPARTMENT - Department of Power (STATE)

The Beneficiary of this service will be Business persons ( G2B )

Types of Service:
Regulatory
(Regulatory Services are those which can be denied by the government)

Do applicant(s) need to register to avail this service?
Yes
The URL at which more information about service are available :
No of Days within which service will be delivered after application submission?
15           Day

Note: The time period given is excluding the Government holiday list

Who can apply for this Service?

 
The Application can be submitted by the following:
Institution

How to submit application and Enclosure Details?

  The Application can be submitted by the following:
Online


Following Documents are required along with the application form

Enclosure Type
Type Of Enclosure Original / Photocopy Attestation Required Documents Recommended
Details of earthing Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Details of earthing    Details of earthing    Details of earthing    Details of earthing    Details of earthing    Details of earthing   
details of different type of supports used in the overhead line Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line   
A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances   
A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc. Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.   
Copy of Approval of the state government under section 68 of Electricity Act, 2003 Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV   
Route map of the overhead line Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal   
NOC (No Objection Certificate) Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.   
Copy of Provisional Estimate Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate   
Copy of PTCC clearance Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line   
Copy of Challan Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan   
Other Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Other    Other    Other    Other    Other    Other   
Details of earthing Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Details of earthing    Details of earthing    Details of earthing    Details of earthing    Details of earthing    Details of earthing   
details of different type of supports used in the overhead line Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line   
A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances   
A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc. Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.   
Copy of Approval of the state government under section 68 of Electricity Act, 2003 Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV   
Route map of the overhead line Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal   
NOC (No Objection Certificate) Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.   
Copy of Provisional Estimate Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate   
Copy of PTCC clearance Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line   
Copy of Challan Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan   
Other Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Other    Other    Other    Other    Other    Other   
Details of earthing Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Details of earthing    Details of earthing    Details of earthing    Details of earthing    Details of earthing    Details of earthing   
details of different type of supports used in the overhead line Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line   
A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances   
A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc. Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.   
Copy of Approval of the state government under section 68 of Electricity Act, 2003 Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV   
Route map of the overhead line Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal   
NOC (No Objection Certificate) Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.   
Copy of Provisional Estimate Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate   
Copy of PTCC clearance Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line   
Copy of Challan Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan   
Other Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Other    Other    Other    Other    Other    Other   
Details of earthing Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Details of earthing    Details of earthing    Details of earthing    Details of earthing    Details of earthing    Details of earthing   
details of different type of supports used in the overhead line Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line   
A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances   
A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc. Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.   
Copy of Approval of the state government under section 68 of Electricity Act, 2003 Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV   
Route map of the overhead line Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal   
NOC (No Objection Certificate) Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.   
Copy of Provisional Estimate Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate   
Copy of PTCC clearance Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line   
Copy of Challan Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan   
Other Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Other    Other    Other    Other    Other    Other   
Details of earthing Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Details of earthing    Details of earthing    Details of earthing    Details of earthing    Details of earthing    Details of earthing   
details of different type of supports used in the overhead line Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line   
A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances   
A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc. Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.   
Copy of Approval of the state government under section 68 of Electricity Act, 2003 Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV   
Route map of the overhead line Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal   
NOC (No Objection Certificate) Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.   
Copy of Provisional Estimate Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate   
Copy of PTCC clearance Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line   
Copy of Challan Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan   
UBIN Certificate Original Original Not Required Not Required Copy of UBIN (Unique Business Identification Number) Certificate    Copy of UBIN (Unique Business Identification Number) Certificate   
Other Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Other    Other    Other    Other    Other    Other   
Details of earthing Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Details of earthing    Details of earthing    Details of earthing    Details of earthing    Details of earthing    Details of earthing   
Other Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Other    Other    Other    Other    Other    Other   
details of different type of supports used in the overhead line Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line    Sketch showing details of different type of supports used in the overhead line   
A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances    A sketch of guards provided with dimensions, size of wires along with vertical & horizontal clearances   
A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc. Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.    A sketch showing alignment of line indicating positions of sub-stations, supports, CT, PT etc.   
Copy of Approval of the state government under section 68 of Electricity Act, 2003 Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV    Copy of Approval of the state government under section 68 of Electricity Act, 2003, in case of overhead line of operating voltage exceeding 11KV   
Route map of the overhead line Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal    Route map of the overhead line, showing alignment of nearby overhead line, if any, with clearances both vertical and horizontal   
NOC (No Objection Certificate) Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.    Copy of “No Objection” or otherwise permission from appropriate owner of the land/ premises, in case the applicant is not the owner.   
Copy of Provisional Estimate Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate    Copy of Provisional Estimate   
Copy of PTCC clearance Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line    Copy of PTCC clearance, if the line is in proximity or crosses telecommunication line   
Copy of Challan Original Original Original Original Original Original Not Required Not Required Not Required Not Required Not Required Not Required Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan    Treasury Challan   
UBIN Certificate Original Original Not Required Not Required Copy of UBIN (Unique Business Identification Number) Certificate    Copy of UBIN (Unique Business Identification Number) Certificate   

Pre-defined format/template
Document Name Prescribed Format
Authorization Letter view
Cable Test Result view
Test Report view
Undertaking for any Govt. Scheme view



What will Applicant get as Service Deliverable?

  The applicant will receive Output Certificate/Report as the service deliverable(s).
Certificate/Report